Washroom Refurbishment: What to Expect, Step by Step

Short answer

A commercial washroom refurbishment usually runs: survey and measure, agree layout and materials, order made-to-measure cubicles and IPS panels, strip out the old fittings, carry out plumbing, electrical and wall and floor work, then install cubicles, IPS panelling, vanity units and accessories. Cubicle installation itself takes a day or two, but allow a few weeks lead time for manufacturing.

Washroom Refurbishment: What to Expect, Step by Step

Survey and design

Every refurbishment starts with a site survey. The installer measures the room accurately, notes ceiling height, wall and floor construction, positions of soil stacks, water supplies and drainage, windows, doors and radiators. They also ask how the washroom is used, how many people use it, and whether it needs to stay partly open during the works.

From that survey, a layout is drawn showing cubicle sizes, door swings, ambulant or enlarged cubicles, urinals, IPS panelling and vanity units. Approved Document M considerations for accessible toilets and the Workplace (Health, Safety and Welfare) Regulations 1992 requirement for suitable and sufficient toilets for staff both shape the layout. Materials, colours and hardware are agreed at this stage.

A washroom refurbishment usually needs several trades: the cubicle installer, a plumber, an electrician and often a tiler or flooring contractor. Decide early who is managing the project. Some cubicle specialists offer a full design and build service and coordinate everything, while others supply and fit cubicles and IPS only, leaving other trades to you or your main contractor.

If the work is part of a wider fit-out or a new building, building control may be involved, particularly on accessible toilet provision and ventilation. Brief the installer on any approvals early, so drawings and product information are ready when needed. Agree access arrangements, working hours, waste removal and a named contact on site before work starts, which avoids delays on the day.

Typical refurbishment timeline

Timings vary with the size of the washroom and how much other work is involved, but most projects follow a similar sequence.

StageWhat happensTypical duration
Survey and quoteMeasure, discuss use, agree scopeA few days to a week
Design sign-offLayout, materials, colours and hardware agreedDepends on approvals
ManufacturingCubicles and IPS panels made to measureA few weeks
Strip outRemove old cubicles, fittings and panels1 day
First fix tradesPlumbing, electrics, walls and floorsSeveral days depending on scope
InstallationCubicles, IPS, vanity units and accessories1–3 days
HandoverCheck doors, locks, fittings and cleanSame day

Keeping the building running

In offices, schools and public buildings, closing all toilets at once is rarely possible. Options include refurbishing one washroom at a time, working during holidays or out of hours, and hiring temporary toilet units for the duration. In schools, holiday periods are usually the best time, so plan well ahead because installers are busiest then.

Phased working adds time and cost, because the installer must protect working areas and may make several visits. Agree a clear plan before work starts so staff and visitors know which facilities are open.

  • Refurbish one washroom at a time where there are several
  • Use holidays or quiet periods in schools and offices
  • Consider temporary toilet hire for single-washroom buildings
  • Signpost alternative facilities clearly
  • Keep accessible toilets open where possible during works

Strip out and preparation

Old cubicles, panels, vanity units and accessories are removed and disposed of. In buildings constructed before 2000, check the asbestos register before disturbing boxing, duct panels, floor tiles or ceilings, because some older materials may contain asbestos. Any work affecting asbestos must be managed under the Control of Asbestos Regulations 2012.

Once stripped, plumbers alter supplies and wastes, electricians move lighting, hand dryers and alarms, and walls and floors are repaired or retiled. Cubicles need a level, finished floor and sound walls for fixing, so these trades must finish before cubicle installation begins.

Installing cubicles, IPS and vanities

IPS frames are usually installed first, with cisterns, valves and pipework mounted behind. Duct panels are then fixed, with access panels where maintenance is needed. Cubicle panels and pilasters are set out, fixed to walls and floors with brackets and adjustable feet, and tied together with a headrail. Doors are hung and adjusted so they close properly and locks line up.

Vanity units with integrated basins and worktops are fitted over IPS panels or framing. Finally, accessories such as toilet roll holders, coat hooks, sanitary bins, grab rails and signage are fitted.

Handover and aftercare

At handover, check every door opens and closes smoothly, locks engage and indicate correctly, emergency release works from outside, grab rails are secure and panels are level. Ask the installer for product information, hardware details and any spare parts, such as hinge cams and lock keepers. Most cubicle problems in the first months are adjustments, which a good installer will put right quickly. A repair visit from £150 deals with later wear, such as replacing locks, hinges and feet.

Budgeting the whole project

Cubicles are only one part of a washroom budget. MFC cubicles cost £350–£550 each, compact laminate £550–£900 and full-height premium systems from £1,200 per cubicle. IPS duct panelling adds £180–£350 per linear metre, and urinal screens £90–£180 each. On top of that, plumbing alterations, new sanitaryware, electrical work, wall and floor finishes, lighting and accessories can easily match or exceed the cubicle cost in a full refit.

Ask for a schedule that separates each element, so you can see where the money goes and compare quotes fairly. If the budget is tight, keep sound sanitaryware and floors and focus spending on cubicles, IPS and lighting, which change the look most.

Questions people also ask

How long does a washroom refurbishment take?

The on-site work for a typical commercial washroom takes from a few days to around two weeks, depending on plumbing, electrical and tiling work. Cubicle installation itself takes one to three days. Allow a few weeks before that for cubicles and IPS panels to be manufactured to measure.

Can toilets stay open during a washroom refurbishment?

Often, partly. Where there are several washrooms, they can be refurbished one at a time. Work can be done out of hours or in holidays, and temporary toilets can be hired for single-washroom buildings. Phased working takes longer and may cost more, so plan it before work starts.

What should be checked at washroom handover?

Check that every door opens and closes properly, locks engage and show engaged or vacant, emergency release works from outside, grab rails are secure, panels are level and IPS access panels open. Ask for product information and spare hardware parts for future maintenance.